The Rail Accident Investigation Department (RAIB), which experiences to the Department for Transport, independently investigates accidents and disseminates its findings to strengthen railway safety.
At around 2:15pm on 14th March the motive force of an Avanti West Float whisper travelling from Glasgow to London Euston reported a shut to miss with a observe employee shut to to Euxton Junction on the West Float Indispensable Line. The observe employee alive to became as soon as a controller of characteristic safety (COSS) who, on the time of the incident, had been hunting for a lineside enviornment cupboard (LOC) to undertake scheduled upkeep work.
The COSS became as soon as alerted to the forthcoming whisper, which became as soon as travelling at 110 mph, by a shouted warning from a member of the final public on a shut-by footbridge and by the whisper driver sounding the whisper’s warning horn. The COSS managed to pass to a enviornment of safety approximately two seconds earlier than the whisper reached his enviornment.
The RAIB squawk chanced on that the shut to miss came about for the reason that COSS had misidentified which of the railway lines on the positioning had been closed to trains (is named a line blockage). Even although signage at one of the vital salvage admission to capabilities primitive by the team accurately showed the structure of the observe, the COSS did not recognise the error. The error became as soon as furthermore not challenged by the choice member of the team for the interval of a briefing given by the COSS.
The characteristic of the incident became as soon as shut to Euxton Junction, south of Preston. There are four railway lines at this level. The lines relevant to this incident are designated because the Up Rapidly and the Down Rapidly. The alternative two lines are designated because the Up Slack and the Down Slack.
The COSS had been despatched a stable system of labor (SSOW) as allotment of a stable work kit (SWP) however had already began their shift earlier than it arrived. This contravenes Community Rail safety frequent NR/L2/OHS/019 ‘Security of of us at work on or shut to the line’ which states that “as soon as the particular person accountable has reviewed the SWP, they shall take a look at the SWP not lower than a shift in come”.
This pack contained minute print of three SSOWs which had been to be primitive as allotment of the work. These incorporated a separated system of labor which, on the incident enviornment, would contain required the team to care for not lower than two metres between the positioning of labor and the closest operating rail of the adjoining originate line. The SWP furthermore incorporated one deliberate line blockage for the ‘up fast’ line, and a 2nd for the ‘down fast’ line to permit other gadgets of labor to steal space closer to the lines alive to.
The team got a piece define requiring them to conduct two separate gadgets of upkeep work: testing within a LOC, and a observe circuit inspection, each and every of which had been in the same space.
The COSS and the choice team participants are domestically primarily based and accustomed to the space the set the incident took space. Alternatively, the COSS can also not recall beforehand going to the specified LOC and became as soon as unaware of its exact enviornment.
For this reason, the COSS checked the positioning of the LOC earlier than leaving the depot. Alternatively, in doing so, the COSS acknowledged a optimistic LOC with the same identifying amount. This became as soon as located on an adjoining allotment of the line next to the Down Rapidly line, whereas the LOC to be worked on became as soon as located next to the Up Rapidly line.
Based on this, the COSS departed the depot with an incorrect figuring out that the LOC on which the work became as soon as to be applied became as soon as located next to the Down Rapidly line.